Enfield Civic Centre, London Borough of Enfield
Type: Refurbishment
Value: £8.8m
Duration: 99 weeks
“Working within an occupied building is a skillset in itself and I have found that ITC possess this ability. They have worked most flexibly with us and gone the extra mile to provide an end product that we are very happy with.”
Stuart Simper I Head of Facilities Management I Enfield Council
Multi-phased project within occupied building delivers high quality community space.
We carried out a multi-phased project for Enfield Council, refurbishing the Enfield Civic Centre.
It involved 10,250 sq ft of office space; working from the ninth floor down to the third. We fit-out two floors at a time, with each pair taking 14 weeks to complete.
Asbestos was removed and floors were stripped out, and we installed new toilets, showers, break-out areas, copy points, feature ceilings, and flexible meeting spaces with sliding, foldable glass walls.
The works in this occupied and public facing building were logistically challenging. Our team completed the project in a live environment with the building remaining in occupation throughout the build, which required careful planning and noise management.
Members of our team carried out split shifts over what could sometimes stretch to 16-hour days, to supervise the scale of work undertaken.